Repair & Restoration of
Saylesville Meeting House
Last updated: Monday, June 4, 2012 6:29 PM
Left Center Post
     Water traveling down from the tie beam and any other leaks in the area has rotted the lefthand centerpost and the connection to the girt beam (main horizontal beam between the first and second floors). The girt was left unsupported by the post.
Post?Girt Connection
Rotted connection between post & girt
Left Arrow
 
 
Post & girt showing brace
Right arrow
Girt Brace
     
     The loss of post support for the girt shifted the force to the sheathing. This necessitated the installation of a brace as shown above and the area was blocked off from the inside by a temporary wall which further supported the second floor.
Rotted post
Right arrow
Rot in Post
Left Arrow Gable, Sheathing & Tie Beam   Right Arrow

Walk cheerfully over the earth answering that of God in every person.
George Fox
Maintained by the Providence Monthly Meeting
Last updated: June 4, 2012
Please report any problems to: webclerk@providencefriends.org